DÖRTLER PLASTİK GERİ DÖNÜŞÜM VE GRANÜL
Industrial Wastewater Treatment Plant
In the event that wastewater from the granule washing unit is treated via chemical treatment methods and—achieving zero discharge—the treated wastewater is reused within the washing unit.

Project Details
| Project Name | Industrial Wastewater Treatment Plant |
|---|---|
| Client Company / Institution | Dörtler Plastik Geri Dönüşüm ve Granül |
| Capacity | 480 m³/Day |
| Year Built | 2026 |
| Location | Osmangazi / Bursa |
| Project Status | Ongoing |
| Scope of Work | Engineering / Mechanical / Electrical & Automation |
