İçeriğe geç
Aken Mühendislik Arıtma Sistemleri
DÖRTLER PLASTİK GERİ DÖNÜŞÜM VE GRANÜL

Industrial Wastewater Treatment Plant

In the event that wastewater from the granule washing unit is treated via chemical treatment methods and—achieving zero discharge—the treated wastewater is reused within the washing unit.

Industrial Wastewater Treatment Plant
Project Details
Project Name Industrial Wastewater Treatment Plant
Client Company / Institution Dörtler Plastik Geri Dönüşüm ve Granül
Capacity 480 m³/Day
Year Built 2026
Location Osmangazi / Bursa
Project Status Ongoing
Scope of Work Engineering / Mechanical / Electrical & Automation
Client Company / Institution
Dörtler Plastik Geri Dönüşüm ve Granül